Ajaokuta Steel Project is located on 24,000 hectares of sprawling green-field land-mass. The Steel Plant itself is built on 800-hectares of land. The chosen Technology for Steel Production is the time tested Blast-Furnace – Basic Oxygen Furnace route for Steel Production.

The Ajaokuta integrated steel complex was conceived and steadily developed with the vision of erecting a Metallurgical Process Plant cum Engineering Complex with other auxiliaries and facilities. The complex is meant to be used to generate important upstream and downstream industrial and economic activities that are critical to the diversification of our economy into an industrial one.

SINTER PRODUCTION PLANT
COKE-OVEN AND BY-PRODUCTS PLANT
BLAST FURNACE
STEEL MAKING SHOP
FINISHING MILLS
BILLET MILL
MEDIUM SECTION AND STRUCTURAL MILL
LIGHT SECTION MILL
WIRE ROD MILL

ASCL also offers consultancy services in the following areas:

– Design and drawing.
– Product development.
– General Engineering.
– Rubber product development.
– Plant refurbishing and Turn around Maintenance.

Steel City
Ajaokuta,
Kogi State